Wellington Tier 3 Data Center

High Tech > Data Centers

McPhee completed design, procure, and install work on the Tier 3 data center for Wellington Management Company.  McPhee furnished and installed all temporary power and lighting, conduit wire, panels, and receptacles, power and tele/data whips for workstations and free standing millwork, and power to security and fire suppression systems. 

 

Additionally, McPhee installed a complete lighting control system including occupancy sensors, power packs, and dimming systems, grounding and fire alarm system, and emergency generator and generator load bank connection hookup and disconnect.  The Tier 3 Data Center included multiple independent distribution paths serving the IT equipment, which is also dual-powered and fully compatible with the topology of the site’s architecture.

 

The concurrently maintainable site infrastructure guarantees 99.982% availability. 